High Voltage Reticulation Design
We were contracted to provide a concept design of the underground electrical reticulation including substations, compressed air and primary pumping stations from which a construction budget of the new underground mine could be developed. Through our experience with the development and installation of underground infrastructure we were able to develop installation plans and projected costs […]
![](https://mbieng.com.au/wp-content/uploads/2020/11/grain-storage-small.jpg)
Grain Storage Facility Electrical Installation
We conducted the electrical installation for two grain storage silos for a large farm. This standalone system was designed and integrated together to behave as if the system was connected to the power grid, while pulling power from a generator. The system’s automation features help save on man hours, allowing the farmer to spend their […]
![](https://mbieng.com.au/wp-content/uploads/2020/12/IMG_6703.jpg)
Automatic Livestock Drafting System
We’ve applied our experience to create a prototype automated drafting system for livestock. We can design and build these to work with your existing livestock handling systems such as a cattle crush. They can be programmed to draft via remote control, weight or RFID tags, giving the farmer the information that they need at the […]
![](https://mbieng.com.au/wp-content/uploads/2020/11/grain1.jpg)
Grain Drying and Handling Facility Installation
We completed the electrical design and installation of a grain handling facility for an established agricultural client who grows corn, wheat, barley and lucerne crops. The facility allowed the client to grow and harvest corn all year round, helping them become a more efficient producer. We completed the full electrical design, constructed a Motor Control […]
![](https://mbieng.com.au/wp-content/uploads/2020/11/valve.jpg)
Valve Control Panel Design
We designed a control panel operating a set of valves in a pastefill system underground. The panel required a full uninterruptible power supply to ensure that the valves could still be operated in the event of a power failure, preventing potential damage to millions of dollars of infrastructure. We came up with an extra low […]