Refurbishment and Upgrade Details

Structural and IP integrity;

  • Sand blasted
  • Prime coat with a high build zinc rich metal primer to improve longevity of the board
    versus powder coating and top coated with a 2 part industrial “Harbour Blue” finish
  • Rust holes cut out and new steel welded in and stainless steel gland plates installed.
  • New frame hot dip galvanised was fabricated for the pump starter and integrating a
    remote I/O rack for pump station monitoring.

Electrically;

  • Upgraded from dual 75kW to dual 90kW this included
    • Replacement of main contactors
    • Replacement of 1000V cabling
  • Review and audit compliance to AS 4871
  • Design and construction of auxiliary cubicle for feedback to underground PLC and
    monitoring via site SCADA.
  • “As built” of;
    • Drawings
    • I/O list
    • Equipment list
  • Commissioning and documentation.

DSC_0793

Pump Starter Prior To Commencement Of Work

Rusted out section in the bottom of the board

20160613_155735

Rust repairs, sandblasted, resprayed & new gland plates installed

Power and control wiring upgrade for new level control and monitoring

Power and control wiring upgrade for new level control and monitoring